亚洲综合精品香蕉久久网-日本十八禁视频无遮挡-国产成人精品福利一区二区-欧美成人精品第一区-亚洲一区二区三区四区五区黄



The installation of the planetary gearbox is a relatively simple process, but some details need to be paid attention to during the installation process. The installation process of the planetary gearbox is roughly divided into three steps:



1. check the size matching,

2. installation, and

3. testing.


The main thing is to confirm the planetary gear. The coaxiality of the gearbox during installation will have a great impact, so let's learn about the installation process of the planetary gearbox and some precautions!


Before installing the planetary gearbox and the motor, it is necessary to confirm whether they are in good condition, and it is necessary to check whether the dimensions of the connected parts match, mainly referring to whether the installation size between the motor and the gearbox is correct.


Send the screws of the dust-proof holes on the outer side of the planetary gearbox, adjust the position to align the side holes and the dust-proof holes, remove the motor shaft key, and carry out anti-rust treatment on the installation parts of the motor and the gearbox to ensure the tightness of the connection and the later operation of fluency.


When connecting, it is necessary to ensure that the coaxiality between the two is consistent.

If it is inconsistent, it will affect the later operation, wear the internal gear of the gearbox or break the shaft. During the installation process, it is forbidden to hit the gearbox with a hammer to prevent damage caused by excessive axial force or radial force.


When the gearbox and the motor are connected, first install the diagonal screws to ensure uniform force, then install the other two diagonal bolts, tighten the four mounting bolts one by one, and finally tighten the captive screws on both sides, some high-precision installation requires the use of a torque wrench.


After the gearbox is installed, it needs to be fixed on the bracket, and the stability of the installation needs to be ensured.

If the gearbox is unstable during high-speed operation, it may cause vibration and external noise, which will indirectly affect the coaxiality of the installation.


When gears or other components are externally installed during transmission, protective devices need to be installed.


After the installation is completed, check the stability and flexibility of the installation parts in turn, and the idling test can be carried out. The operation process should be relatively stable, without obvious vibration and noise. When there are some abnormal phenomena, the problem should be eliminated.


The planetary gearbox needs to be carefully installed during the installation process. Good installation can achieve twice the result with half the effort. Installation according to standard procedures can save a lot of maintenance costs in the later period. If the coaxiality is inconsistent during installation, it will have a great impact on the later use and the gearbox itself. Therefore, during the installation of the gearbox, attention must be paid to the coaxiality of the gearbox and some details.


An installation notice will be provided with each gearbox Motoreducer sells. You can refer to it and make sure it is done according to the right process!




Phone

Phone

17715386183

Address

Address

No.10 Haizhou Road, Binhai Industrial Park, Qidong City, Jiangsu Province

主站蜘蛛池模板: 无码精品日韩专区| 久久亚洲精品无码爱剪辑| 国产三级久久精品三级| 亚洲欧美成人久久综合中文网 | 欧洲av成本人在线观看免费| 高清免费精品国自产拍| 成人做受120秒试看试看视频 | 日本乱码伦午夜福利在线| 亚欧成人无码av在线播放| 2020精品国产自在现线看| 久久久久久曰本av免费免费| 日本黄网站三级三级三级| 摸进她的内裤里疯狂揉她动图视频| 日韩人妻少妇一区二区| 亚洲自偷精品视频自拍| 久久99精品国产99久久6不卡| 无码精品国产va在线观看| 欧美做爰一区二区三区| 无码国产69精品久久久久同性| 无码一区18禁3d| 亚洲精品国产品国语原创 | 国产精品久久久久这里只有精品| av无码国产在线观看岛国| 国产亚洲情侣一区二区无| 性做久久久久久久| 中文在线中文资源| 免费萌白酱国产一区二区三区| 日本xxxx色视频在线观看| 无码毛片内射白浆视频| 99久久国产综合精品女同图片| 国产不卡久久精品影院| 亚洲狠亚洲狠亚洲狠狠狠| 国产乱人伦偷精品视频不卡| 在线人人车操人人看视频| 97久久综合亚洲色hezyo| 亚洲精品nv久久久久久久久久| 一本久久伊人热热精品中文| 亚洲精品沙发午睡系列| 亚洲午夜性猛春交xxxx| 特黄做受又硬又粗又大视频小说| 香蕉免费一区二区三区|